End-to-end installation from design through to grid connection.

Our installation process covers site assessment, system design, council and network approvals, installation day, and grid connection paperwork — handled entirely by our in-house team.
On-site installation is typically completed in 1 to 2 business days. The end-to-end timeline from signing the proposal to permission-to-connect (including Ausgrid/Endeavour Energy grid approvals and bi-directional meter configuration) usually takes 2 to 4 weeks.
We install on virtually all Australian roof types, including Colorbond, corrugated tin, concrete tiles, terracotta tiles, and flat kliplok metal roofs, using specialized non-penetrating clamps and cyclone-rated mounting rails.
Hujurat Solar handles 100% of network connection applications, safety certificates of compliance (CCEW), and meter reconfiguration requests with your energy retailer on your behalf.